LUMBER MANUFACTURER NO.2
Vinogradovsky lumber factory, Archangels region:
Own forestry, lumber and supply.
- Total surface - 430,556 sq. ft., including 53,000 manufacturing facilities
- Number of employees - 98
- Dehumidifying/drying facilities:
- Boiler/fan Kovrov, Russia
- 4 ea. drying chambers Katres, Czech Republic
- 2 ea. drying chambers each 60 cu. meters., Nardi, Italy
- Each load - 550 cu. meters.
- Drying cycle – 6 days, 5 cycles per month.
- Total output of dried product – 2,750 cu. meters. per month.
- Plane equipment:
- LMS Thundermac, Germany, 2015 year of manufacturing.
- LMS 523, Germany, 2010 year of manufacturing.
- LMS 623S, Germany, 2007 year of manufacturing.
- Loaders:
- 3 ea. VOLVO
- 2 ea. of Kombilift
- 6. Total output capacity of 2&Btr 1x4 and 1x6 – 1,900 cu. meters. per month (38 HQ containers).
Please see attached pictures of the facility and of the equipment.